Agreement of IZSC on the submission of DRR for the application of PPP to be used under greenhouse conditions
The Interzonal Steering Committee (IZSC) has reached the following agreement:
Applicants that submit applications for the registration of PPP to be used under protected conditions should submit the following:
- 1 DRR with the information and risk assessment for the protected structures for which the risk assessment does not include the consideration of the agronomic and environmental conditions of the different zones. This DRR shall be evaluated at interzonal level and will include the high technology and the low technology (including the Mediterranean) greenhouses. These types of structures include soil bound and soil less growing media. This DRR will be evaluated by the izRMS.
- 1 DRR with the information and risk assessment for the protected structures for which the risk assessment does include the consideration of the agro-nomic and environmental conditions of the different zones. This DRR shall be evaluated at zonal level and will include the walk in tunnels, open protective structures and the field uses. This DRR will be evaluated by the zRMS.
IZSC encourage izRMS and zRMS to collaborate and share the assessment of the common sections of the dossier.
This agreement will be applicable since June the 1st of 2022.