Go to content
To the homepage of english.ctgb.nl
You are here: Home Plant Protection Products Documents Calculation sheets Fate & Behaviour

Calculation sheets Fate & Behaviour

Assessment framework PPP | 26-10-2016

Excel calculation sheets are available for:

Attachments

  • PEC surface water, TWA calculation on days other than 4, 21 and 28 days

    Assessment framework PPP | 28-10-2016

  • Calculation of sewege treatment input (+ SimpleTreal)

    Assessment framework PPP | 28-10-2016

  • Calculation of PEC soil values

    Assessment framework PPP | 22-12-2017

  • Calculation method to derive surface water concentrations of Plant Protection Products at drinking water abstraction points

    In line with the decision tree on drinking water laid down in the Ctgb evaluation manual, this tool is to be used for the ...

    Assessment framework PPP | 28-10-2016

Share this page

  • Share this page on your X account
  • Share this page on your Facebook account
  • Share this page on your LinkedIn account

Service

  • Contact
  • Documents
  • RSS
  • Jobs
  • Sitemap
  • Archive
  • Disclaimer

About this site

  • Copyright
  • Privacy
  • Cookies
  • Accessibility
  • Report vulnerability

This website in other languages:

  • Nederlands